Which of the following is not the function of production management?
(a) Process Planning
(b) Capacity Planning
(c) Production Planning & Control
(d) Operation Research

In which stage of the product life cycle the competition is more
(a) Introduction
(b) Growth
(c) Maturity
(d) Decline

Which of the following is quantitative type of forecast method?
(a) Market survey
(b) Delphi method
(c) Moving average method
(d) Executive opinion

Forecasting is on the basis of
(a) Time
(b) Season
(c) Cycle
(d) All of the above

Capacity planning is
(a) level of capacity the organization provides
(b) Minimum output of system
(c) Over all production
(d) None of the above

Which of the following comes under middle level of planning?
(a) Capacity planning
(b) Aggregate Planning
(c) Operational Planning
(d) All of the above

What do you mean by Master production schedule?
(a) overall production plan
(b) Schedule made by master
(c) Most important schedule
(d) None of the above

The following are required for material requirement planning
(a) Bill of material
(b) Mater production schedule
(c) Inventory status
(d) All of the above

Bin cards are used in
(a) Workshop
(b) Store
(c) Foundry
(d) Assembly shop

Routing prescribes the
(a) proper utilization of man power
(b) flow of material in the plant
(c) proper utilization of machines
(d) inspection of final product

Scheduling is
(a) to confirm the time required to complete the job
(b) to specify the sequence of job according to job and machine
(c) to allot the job to M/C
(d) To allot the job to operator

Control of production is done by
(a) Dispatching
(b) Follow-up
(c) Scheduling
(d) Routing