If you are preparing MPSC, RSMSSB, TNPSC, Karnataka PSC, KPSC, APSC, TSPC, WBPSC, Vyapam, CGPSC, UPSSSC, UKSSSC, OSSC, HPSSC, DSSSB, JKSSB, BPSC, JPSC, GPSC Junior Engineer or Assistant Engineer Civil exam and searching the topic wise objective type questions for preparation of the said exam, then your are in right place. here we are providing the study material/Sample paper/ model paper for the above said exam.
To make out an estimate of a civil structure, we required
(a) Drawing
(b) Specification
(c) Rate
(d) All of the above
Estimate based on the cubic content
(a) Preliminary estimate
(b) Plinth area estimate
(c) Cube rat estimate
(d) Revised estimate
When the original sanctioned estimate is exceeded by more than 5%, in the circumstances which estimate is required?
(a) Supplementary estimate
(b) Revised estimate
(c) Detailed estimate
(d) Annual repair estimate
It is built-up covered area of a building measured by external dimension of the building at floor level is called
(a) floor area
(b) carpet area
(c) plinth area
(d) All of the above
The measurement of all works and supplies are recorded in
(a) Muster roll
(b) Measurement book
(c) Cash book
(d) Hand book
On the acceptance of the tender the contractor has to deposit 10% of the tendered amount is known as
(a) Earnest money
(b) Imprest money
(c) Security money
(d) Cash money
The determination of rate per unit of particular item of work for cost of quantities of materials and cost of labour is known as
(a) General specification
(b) Detailed specification
(c) Estimated cost
(d) Analysis of rate
White washing or colour washing three coats per day per white washer is
(a) 100 sq.m
(b) 200 sq.m
(c) 70 sq.m
(d) 150 sq.m
Brick work in cement mortar in super structure per day per mason
(a) 1.0 cu.m
(b) 1.5 cu.m
(c) 2.0 cu.m
(d) 2.5 cu.m
Cement conrete 1:2:4 per day per mason can do
(a) 4.0 cubic meter
(b) 4.5 cubic meter
(c) 5.0 cubic meter
(d) 5.5 cubic meter